Chalk House - Steelwork is in
Work is continuing on site at Chalk House with steelwork now installed in the basement and on the ground floor, ready for the extension.
T: 0208 533 8162 — E: studio@mustardarchitects.com
Work is continuing on site at Chalk House with steelwork now installed in the basement and on the ground floor, ready for the extension.